Home Project Overview Schedule Current Status Our Team FAQ Photos Photos 2 Contact Us

Photo Gallery I

Beginning Construction of the Dakota Outfall Project
Beginning Construction of the Dakota Outfall Project
Beginning Construction of the Dakota Outfall Project
Beginning Construction of the Dakota Outfall Project
Precast Jacking Pipe Placement for Tunneling Operation
Precast Jacking Pipe Placement for Tunneling Operation
Permeation Grouting Under Railroad Tracks
Permeation Grouting Under Railroad Tracks
At work on the Dakota Outfall Project
At work on the Dakota Outfall Project
CAT 360 Excavator at Santa Fe with Tunnel Operation In Background
CAT 360 Excavator at Santa Fe with Tunnel Operation In Background
Tunnel Boring Machine Conveyor and Trolley
Tunnel Boring Machine Conveyor and Trolley
108 Inch Tunnel Jacking Pipe Under Railways
108 Inch Tunnel Jacking Pipe Under Railways
Continued installation of triple box culvert just East of Santa Fe.
Continued installation of triple box culvert just East of Santa Fe.
Contact grout installation of tunnel under railroad tracks
Contact grout installation of tunnel under railroad tracks
Installation of transition structure #2 in Alameda Station Lot Parking Lot.
Installation of transition structure #2 in Alameda Station Lot Parking Lot.
Continued excavation through Alameda Station Parking Lot.
Continued excavation through Alameda Station Parking Lot.

Effects A   Effects B   Effects C   Effects D   Button Helper   Thumbnail Helper   Simple Gallery  

Copyright © 2017 bmpmd.com - All rights reserved

     site map     contact

Mobile Site (fewer graphics)

Denver Web Design Firm